Loading..

Approved Document 15 0

Last updated on Jul 06, 2020 01:19 in NIIX ISO DMS » Report
Posted ByAdmin

 List of document which had been approved in the system. 


Steps to generate Approved Document:

  • Select Date Selection whether want the report for all time or date range.
  • Identify the time frame of report via “From” and “To” date (if necessary)
  • Select the preferred ISO standard
  • Select the preferred Department
  • Select the preferred Category
  • Select related document information to be retrieved and click Search
  • Click Clear to cancel the selections
  • Notes:

    • Search result list can be downloading in Excel or PDF format.

    Video
    ** The time is base on America/New_York timezone